Ballast Water Management System [ BWMS ]
Sinco provides shipowners with one-stop turnkey total design engineering solution for retrofitting of the BWMS from Front-End Conceptual Engineering, 3-D Scanning & Modelling to Detailed Design Engineering for Class approval and pre-fabrication.
Authorised aftersales service partner, design engineering partner, and authorized representative, agent & partner of several renowned manufacturer :
Headway OceanGuardⓇ BWMS
Hanla EcoGuardian™ Ballast Water Treatment System
NK-O3 Blue Ballast System Water Treatment
Sunrui Balchlor Ballast Water Management System
Sinco Project Track Records
Why BWMS
|
Shipping moves over 80% of world’s commodities and transfers approx. 3 to 5 billion tonnes of water internationally each year. |
|
|
When thousands of marine species carried in ship’s ballast water intake are transported to other parts of the globe, the impact can be devastating and irreversible. |
|
|
Such invasion can jeopardise the local ecosystem, and even pose threats to human health. |
|
|
This threat has been identified as one of the four greatest threats to the world’s ocean. |
|
|
Hence in 2004, IMO adopted the International Convention for the Control and Management of Ship’s Ballast Water and Sediments, which will phase in the Ballast Water Treatment System. |
Various Challenges of Retrofitting The BWTS
| BWTS Technology Selection | |
| Right Sizing The BWTS Capacity | |
| Preliminary Design Engineering ( Piping, Electrical, Controls and Interlocking requirements ) | |
| Verify System Fit | |
| Modelling For Owners Approval | |
| Detailed Engineering Design | |
| Class Approval | |
| Pre-Fabrications & Modifications | |
| On-Site Installation & Commissioning | |
| After Sales Services |
Sinco Provides Front-End Conceptual Design Engineering Services
| Assist with BWTS technology assessment and selection | |
| Study ballasting requirements on ship specific to design BWMS | |
| Assist in right sizing the BWTS equipment capacity | |
| Study electrical power, controls and valve inter-locking requirements | |
| Conduct 3D scanning, model the lay-out and verify system fit | |
| Present 3D overlay modelling and system fit for Owners approval |
Sinco Provides Detailed Design Engineering Services
| Liaise with BWTS manufacturer for total technical aspects and system integration | |
| Onboard verification of drawings against as built conditions, review loading plans, cable routing, and penetrations | |
| Complete layout and pipe modifications design engineering | |
| Develop electrical and ballast controls modifications design engineering | |
| Develop detailed piping modification design engineering | |
| Develop detailed fabrication drawings | |
| Liaise with Class for review and approvals |
